Biogás

Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power

Challenges: Conceptualization, definition, and design of a moto-generator system based on the current dynamic production of a paper mill. Solutions and Results: Characterization of biogas. Definition of the system based on the current biogas production dynamics. Definition of operation and synchronization with the existing turbine. Definition of the dehumidification system. Definition of the system’s operational logic. Definition of technical specifications for the moto-generator. Design of the cogeneration system and heat utilization.

Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power Read More »

Consultoría en ingeniería

Dehydration, Handling, and Disposal of Solids in a Nickel-Cobalt Mine

Challenges: Reducing the waste zone resulting from leaching, thereby decreasing the environmental impact of ore beneficiation. Solutions and Results: Implementation of a large-scale waste filtration process for stacking. Reduction of the environmental impact area. Capital savings in waste disposal. Collaborative effort among offices in 5 countries, spanning 3 continents and 4 languages. Approximate investment: $650 million USD. New Caledonia, 2018

Dehydration, Handling, and Disposal of Solids in a Nickel-Cobalt Mine Read More »

construcción de viaducto y muelle de carbón a granel

Supervision of Design and Construction for Bulk Coal Loading Viaduct and Pier

Challenges: Quality control and schedule adherence for the construction of a marine pier designed for 24/7 operations. Solutions and Results: Adherence to high-risk environmental conditions, including storms, lightning, and tides. Offshore piloting for a 1600 m viaduct and 800 m pier height. Strict quality assurance and control plan. Synchronized scheduling for piloting, superstructure assembly, and road surface layer casting. Concrete quality assurance plan. Control of pile penetration into the seabed. Precision topographical control. Approximate investment: $90 million USD. Dibulla, La Guajira

Supervision of Design and Construction for Bulk Coal Loading Viaduct and Pier Read More »