Debottlenecking through Cross-Feeding Conveyors

Challenges:

  • Feasibility Study of Repurposing Fine Process Byproducts as Raw Material for Calcination to Enhance Process Efficiency.

Solutions and Results:

  • Collaborative work between different areas of metallurgic plant and other contractors.
  • Engineering developed in 4 weeks
  • Analysis of alternatives, including risk analysis, Capex, and Opex, and selection of the most suitable alternative for client.
  • Delivery of the project within the required timeframe, even considering additional analyses not initially planned.
  • Approximate investment: 1.3 million USD.
  • Montelíbano, Córdoba, 2020.