Challenges:

  • Detail design for expanding production by 16% to meet the new market demand in terms of quantity and product attributes (1500 MM m2/year).

Solutions and Results:

  • Structural, mechanical, process, and electrical engineering for a facility that integrates new resources and equipment with existing ones.
  • 3D scanning of facilities for informed and reliable design decisions.
  • Verification and definition of the process flowchart to identify capacities and close the mass balance.
  • Basic and detailed design of subprocesses from paste preparation to the production line.
  • Conceptualization, basic design, and detailed design of the entire structure, equipment layout, and utility services.
  • Equipment design, selection, and adaptation, as well as pipe and conduit design and layout.
  • Electrical engineering for power supply to new equipment.
  • Approximate investment: $5 million USD.
  • Guarne, Antioquia, 2023