Improving of secondary dedusting system of a BOF process at steelworks facility

Challenges: Control de emissions of the hot gasses coming out during hot metal charging, scrap charging, and furnace casting. Gas filtration of the dilutes dust in the combustion gases reducing the impact in the surrounding community Solutions and results: Charging and casting dedusting hoods design, thermal and strain analysis for 3 BOF converting lines. Thermal and strain analyses, and design for refractory and metal ducts to exhaust the hot gases. Static coolers specification, hangers, supports and layout develop for a brown field application. Approximate gas flow 1,500,000 acfm. Capital approximate investment: 50 M USD. Argentina, 2018.

Improving of secondary dedusting system of a BOF process at steelworks facility Read More »

Transferencia de equipos

Facility Transfer and Modifications For New Casting Processes

Challenges: Engineering consulting services for transferring an existing aluminum casting process facility to a new building. Solutions and results: New layout design. Piping and utilities design. Field support during construction and shipping labor of the equipment. Field inspections of structural and civil works Structure design for new mezzanine. Calculations for new utilities for the casting process Concept and design for quick and reliable starting. Commissioning. Approximate investment: 2 M USD Antioquia, Colombia, 2020-2021.

Facility Transfer and Modifications For New Casting Processes Read More »

Conveyor belt and rollers structures line its transfer iron ore into material screen house construction mine site, Sydney, Australia

Debottlenecking through Cross-Feeding Conveyors

Challenges: Feasibility Study of Repurposing Fine Process Byproducts as Raw Material for Calcination to Enhance Process Efficiency. Solutions and Results: Collaborative work between different areas of metallurgic plant and other contractors. Engineering developed in 4 weeks Analysis of alternatives, including risk analysis, Capex, and Opex, and selection of the most suitable alternative for client. Delivery of the project within the required timeframe, even considering additional analyses not initially planned. Approximate investment: 1.3 million USD. Montelíbano, Córdoba, 2020.

Debottlenecking through Cross-Feeding Conveyors Read More »

pronta-ingenieria-interventoria

Peripheral Utilities for 75 MW Metal smelting Electric Furnace

Challenges: Detailed engineering to minimize downtime and startup impact of the calcining and smelting process Solutions and Results: Technical support during construction. Designs for quick and reliable startup. Expansion of the cooling system. Enhancement of the gas handling system, emissions control, and chimney. Coordination among multiple multinational teams. Approximate investment: $25 million

Peripheral Utilities for 75 MW Metal smelting Electric Furnace Read More »

Biogás

Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power

Challenges: Conceptualization, definition, and design of a moto-generator system based on the current dynamic production of a paper mill. Solutions and Results: Characterization of biogas. Definition of the system based on the current biogas production dynamics. Definition of operation and synchronization with the existing turbine. Definition of the dehumidification system. Definition of the system’s operational logic. Definition of technical specifications for the moto-generator. Design of the cogeneration system and heat utilization.

Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power Read More »

Consultoría en ingeniería

Dehydration, Handling, and Disposal of Solids in a Nickel-Cobalt Mine

Challenges: Reducing the waste zone resulting from leaching, thereby decreasing the environmental impact of ore beneficiation. Solutions and Results: Implementation of a large-scale waste filtration process for stacking. Reduction of the environmental impact area. Capital savings in waste disposal. Collaborative effort among offices in 5 countries, spanning 3 continents and 4 languages. Approximate investment: $650 million USD. New Caledonia, 2018

Dehydration, Handling, and Disposal of Solids in a Nickel-Cobalt Mine Read More »

construcción de viaducto y muelle de carbón a granel

Supervision of Design and Construction for Bulk Coal Loading Viaduct and Pier

Challenges: Quality control and schedule adherence for the construction of a marine pier designed for 24/7 operations. Solutions and Results: Adherence to high-risk environmental conditions, including storms, lightning, and tides. Offshore piloting for a 1600 m viaduct and 800 m pier height. Strict quality assurance and control plan. Synchronized scheduling for piloting, superstructure assembly, and road surface layer casting. Concrete quality assurance plan. Control of pile penetration into the seabed. Precision topographical control. Approximate investment: $90 million USD. Dibulla, La Guajira