Discrete events, time and movement study for big sacks logistics

Challenges: Characterizing the supply of powdered material (up to 40 tons/hour), identifying causes of delays, bottlenecks, and opportunities for increasing production.   Solutions and Results: The sack supply process involved forklifts, hoists, operators, storage, elevators, hopper filling and emptying, and more. Documentation of subprocesses and measurement of operation times. Statistical model for estimating speeds, filling rates, emptying rates, transportation, and handling. Development of a predictive discrete event model for operations with random elements. Determination of resource utilization and buffer storage behavior at different movement stations. Proposed strategies to increase capacity, buffers, logistics, and loading/unloading procedures for elevators. Medellin, Colombia, 2022

Discrete events, time and movement study for big sacks logistics Read More »

Integration and Pretreatment of Biogas for Biomethane Production

Challenges Engineering to produce biomethane (720 Nm3/h) from biogas sourced from a wastewater treatment plant (1200 Nm3/h), aiming for profitability and urban benefits.   Solutions and Results: Implement a specialized Pressure Swing Adsorption (PSA) system for CO2 removal and adapt it to handle H2S reduction. Detailed Front-End Engineering (FEL3) for electrical, control, piping, mechanical, and process aspects of the biomethane system. Size, select, and provide a skid-mounted desulfurization and dehydration system capable of removing up to 70 l/h of water and up to 200PPM of H2S from the biogas. Design gas, cooling water, and compressed air pipelines, along with drainage solutions. Ensure proper selection and sizing of safety venting systems and supports. Prepare specifications, work quantities, and Process & Instrumentation Diagrams (P&IDs). Provide comprehensive electrical and control documentation, including connection diagrams, single-line diagrams, control loops, cable tray layouts, equipotential bonding, grounding grids, load studies, and area classifications. By implementing these solutions, our aim is to address challenges and create opportunities, resulting in economic viability and city-wide advantages through advanced biogas utilization.

Integration and Pretreatment of Biogas for Biomethane Production Read More »

Installation of a Dual Production Line for Ceramic Coatings

Challenges: Detail design for expanding production by 16% to meet the new market demand in terms of quantity and product attributes (1500 MM m2/year). Solutions and Results: Structural, mechanical, process, and electrical engineering for a facility that integrates new resources and equipment with existing ones. 3D scanning of facilities for informed and reliable design decisions. Verification and definition of the process flowchart to identify capacities and close the mass balance. Basic and detailed design of subprocesses from paste preparation to the production line. Conceptualization, basic design, and detailed design of the entire structure, equipment layout, and utility services. Equipment design, selection, and adaptation, as well as pipe and conduit design and layout. Electrical engineering for power supply to new equipment. Approximate investment: $5 million USD. Guarne, Antioquia, 2023

Installation of a Dual Production Line for Ceramic Coatings Read More »

Civil and structural engineering for existing buildings

Challenges Conducting a field survey to identify structural deficiencies at 22 buildings from a mining process Solutions and Results Addressing over 850 issues/items requiring remediation actions. Providing recommendations and detail engineering for enhancements, repairs, and modifications. Provide remediation strategy and detail engineering to slabs, braces and roof structures deteriorated due to corrosion and thermal loads. Developing concepts for stairways, platforms, and structures. Evaluating actions for prioritization. Enhancing structures to comply with seismic standards following ASCE, ACI, AISC guidelines. Estimating an approximate CAPEX.

Civil and structural engineering for existing buildings Read More »

pronta-ingenieria-interventoria

Improving of secondary dedusting system of a BOF process at steelworks facility

Challenges: Control de emissions of the hot gasses coming out during hot metal charging, scrap charging, and furnace casting. Gas filtration of the dilutes dust in the combustion gases reducing the impact in the surrounding community Solutions and results: Charging and casting dedusting hoods design, thermal and strain analysis for 3 BOF converting lines. Thermal and strain analyses, and design for refractory and metal ducts to exhaust the hot gases. Static coolers specification, hangers, supports and layout develop for a brown field application. Approximate gas flow 1,500,000 acfm. Capital approximate investment: 50 M USD. Argentina, 2018.

Improving of secondary dedusting system of a BOF process at steelworks facility Read More »

Transferencia de equipos

Facility Transfer and Modifications For New Casting Processes

Challenges: Engineering consulting services for transferring an existing aluminum casting process facility to a new building. Solutions and results: New layout design. Piping and utilities design. Field support during construction and shipping labor of the equipment. Field inspections of structural and civil works Structure design for new mezzanine. Calculations for new utilities for the casting process Concept and design for quick and reliable starting. Commissioning. Approximate investment: 2 M USD Antioquia, Colombia, 2020-2021.

Facility Transfer and Modifications For New Casting Processes Read More »

Conveyor belt and rollers structures line its transfer iron ore into material screen house construction mine site, Sydney, Australia

Debottlenecking through Cross-Feeding Conveyors

Challenges: Feasibility Study of Repurposing Fine Process Byproducts as Raw Material for Calcination to Enhance Process Efficiency. Solutions and Results: Collaborative work between different areas of metallurgic plant and other contractors. Engineering developed in 4 weeks Analysis of alternatives, including risk analysis, Capex, and Opex, and selection of the most suitable alternative for client. Delivery of the project within the required timeframe, even considering additional analyses not initially planned. Approximate investment: 1.3 million USD. Montelíbano, Córdoba, 2020.

Debottlenecking through Cross-Feeding Conveyors Read More »

pronta-ingenieria-interventoria

Peripheral Utilities for 75 MW Metal smelting Electric Furnace

Challenges: Detailed engineering to minimize downtime and startup impact of the calcining and smelting process Solutions and Results: Technical support during construction. Designs for quick and reliable startup. Expansion of the cooling system. Enhancement of the gas handling system, emissions control, and chimney. Coordination among multiple multinational teams. Approximate investment: $25 million

Peripheral Utilities for 75 MW Metal smelting Electric Furnace Read More »

Biogás

Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power

Challenges: Conceptualization, definition, and design of a moto-generator system based on the current dynamic production of a paper mill. Solutions and Results: Characterization of biogas. Definition of the system based on the current biogas production dynamics. Definition of operation and synchronization with the existing turbine. Definition of the dehumidification system. Definition of the system’s operational logic. Definition of technical specifications for the moto-generator. Design of the cogeneration system and heat utilization.

Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power Read More »