Experiences
Facility Transfer and Modifications For New Casting Processes
Improving of secondary dedusting system of a BOF process at steelworks facility
Peripheral Utilities for 75 MW Metal smelting Electric Furnace
Supervision of Design and Construction for Bulk Coal Loading Viaduct and Pier
Integration and Pretreatment of Biogas for Biomethane Production
Civil and structural engineering for existing buildings
Dehydration, Handling, and Disposal of Solids in a Nickel-Cobalt Mine
Debottlenecking through Cross-Feeding Conveyors
Installation of a Dual Production Line for Ceramic Coatings
Discrete events, time and movement study for big sacks logistics
Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power