Experiences

Debottlenecking through Cross-Feeding Conveyors

Facility Transfer and Modifications For New Casting Processes

Dehydration, Handling, and Disposal of Solids in a Nickel-Cobalt Mine

Water Cooling for a 75 MW Electric Smelting Furnace

Installation of a Dual Production Line for Ceramic Coatings

Civil and structural engineering for existing buildings

Peripheral Utilities for 75 MW Metal smelting Electric Furnace

Supervision of Design and Construction for Bulk Coal Loading Viaduct and Pier

Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power

Improving of secondary dedusting system of a BOF process at steelworks facility

Integration and Pretreatment of Biogas for Biomethane Production
