Experiences
Dehydration, Handling, and Disposal of Solids in a Nickel-Cobalt Mine
Improving of secondary dedusting system of a BOF process at steelworks facility
Facility Transfer and Modifications For New Casting Processes
Biogas and Natural Gas Utilization Process to Generate 600 kW of Electrical Power
Supervision of Design and Construction for Bulk Coal Loading Viaduct and Pier
Discrete events, time and movement study for big sacks logistics
Civil and structural engineering for existing buildings
Water Cooling for a 75 MW Electric Smelting Furnace
Debottlenecking through Cross-Feeding Conveyors
Integration and Pretreatment of Biogas for Biomethane Production
Installation of a Dual Production Line for Ceramic Coatings